OCU is currently a Dwr Cymru Welsh Water (DCWW) framework contractor on the Pressurised Pipeline Systems and Emergency Response Works contract; a design and build framework.
All works are completed with full compliance in accordance with the duties of Principal Contractor as defined by CDM Regulations 2015. This current arrangement is a follow-on from our initial Framework contract which was in place for 8 years and one that originally commenced in 2011.
Scope of Works
Construction techniques utilised include:
We have proven ourselves to be flexible and dynamic and our scope of works has grown to include civil engineering works and large diameter pipework on water and wastewater treatment sites and reservoirs.
DCWW have appointed OCU as Principal Contractor on all projects that we undertake within this Framework. We operate on the Framework Contract in all of DCWW’s operational zones with full depots in Deeside (North Wales), Bridgend (South Wales) and Chepstow, with additional satellite facilities where required. Over the course of the contract, we have completed over 360 individual projects and extensive High Risk Emergency Reactive works and multiple Developer Service schemes, ranging in value from £20k to £5m.